You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Waduk Mini di Ceger Capai 80 Persen
.
photo Nurito - Beritajakarta.id

Mini Reservoir Development in Ceger Has Touched 80 Percent

We aim to finish it in two weeks

The 970-square-meter long mini reservoir development work on Jalan SMPN 160, RT 02/05 Ceger, Cipayung, East Jakarta has touched 80 percent.

Cipayung Sub-district Head Fajar Eko Satrio said the development work had been ongoing since a month. It was conducted manually by 20 personnel of the Water Resources (SDA) Task Force and PPSU.

Collapsed Sheet Pile and Reservoir in Kramat Jati Being Repaired

According to him, the reservoir was done to overcome the inundation in the surrounding residential areas due to the existing drainage channels unable to accommodate water.

"We aim to finish it in two weeks," he said, Wednesday (1/27).

Nevertheless, the reservoir was able to accommodate overflowing waters of the existing drainage channels in residential areas.

"To function it optimally, we also build an infiltration well near the reservoir," he said.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1507 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye929 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye431 personBudhi Firmansyah Surapati
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye411 personDessy Suciati
  5. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye399 personFolmer